Disable Preloader

Infrastructure

Fully Equipped

Unit is fully equipped with require for quality fabrication work.

Plot Area 26000 square feet + Out side area 8000  square feet.
Open Area 6000 Sq.ft.
Office / Store 1000 Sq.ft.
Power Connection GEB at present 35HP, applied for extension up to 125HP.
Covered Area 18000 square feet.
Working Cap up to 50mm thk banding, 400 MT, 4 Mtr width Hydraulic press & 3 Mtr wide X 32mm thk Rolling capacity, 20 tone lifting capacity.
Mobile Crane Easily available out source..
Furnace 9 Mtr X 6 Mtr X 5 Mtr
Welding Facility ARC, Argon, Mig, Tig.
Cutting Facility Hand cutting, Torch, Pug machine, Plasma.
Drilling Facility Radial drill m/c 1.5 mtr travel and 40 Dia hole, portable m/c 32 Dia hole, Hand drill m/c.
Compressor up to 6KG contentious air.
Dish End Facilities Our sister consult unit has facility of Dish end manufacturing capacity up to 50mm X 4 Mtrdia with point press method and up to 25mm X 4 Mtr spinning method.
GEB Connection 70 KVA
Work Capacity 40/50 thick & 6 mtr Dia x40/50 Mtr long. Weight capacity up to 40 ton max.
Press Bending Capacity 50 to 100 thick by hydraulic press  (press capacity 400 ton x 3500 wide.)other more heavy capacity for bending with our sister consult unit.
Bending Capacity 32 thick x3 mtr wide + 12 thick x2 mtr wide for S S Plate.
Cranes E.O.T Crane Capacity 10 Tons, 15 Tons. 2 Nos. + 1No.
Mobile Crane Available as an require outsources 10 ton to 200 ton.
Heat Treatment Furnish Size 5 mtr x 6 mtr x 9 mtr. For PWHT & Normalize.
Welding Equipment’s ARC, Argon, Mig, Tig.
Gas Cutting Equipment’s Hand Cutting, Pug cutting. Up to 100 Thik and above outsources.
Plasma Cutting Equipment Up to 25 thick and above outsources.
Air Equipment Compressor m/c 6 Kg continuous air.